Delay Analysis in Construction Contracts

Delay Analysis in Construction Contracts

by Keane, P. John

Type Book
Rate 0.0 /5

The most significant unanticipated costs on many construction projects are the financial impacts associated with delay and disruption to the works. Assessing these, and establishing a causal link from each delay event to its effect, contractual liability and the damages experienced as a direct result of each event, can be difficult and complex. This book is a practical guide to the process of delay analysis and includes an in-depth review of the primary methods of delay analysis, together with …

Read More ↓

Title Statements

  • Full title :Delay Analysis in Construction Contracts.

Summary

The most significant unanticipated costs on many construction projects are the financial impacts associated with delay and disruption to the works. Assessing these, and establishing a causal link from each delay event to its effect, contractual liability and the damages experienced as a direct result of each event, can be difficult and complex. This book is a practical guide to the process of delay analysis and includes an in-depth review of the primary methods of delay analysis, together with the assumptions that underlie the precise calculations required in any quantitative delay analysis. T.

Read More ↓

Edition Statements

  • Publication Date:2009.

Publication Statements

  • Publisher(s):John Wiley & Sons
  • Place of Publication:Chichester
  • Language:eng
  • Publication Date:2009.

The Physical Object

  • Description:1 online resource (288 pages)

Edition Identifiers

  • ISBN:9781444301151, 1444301152
  • oclc:ocn438702175
  • LC Classification:HD9715.A2K443 2008
  • Dewey Decimal:690.0685

Table of Contents

Contents; Preface; Chapter 1: Introduction; 1.1 General; 1.2 Construction delays; 1.3 Burning issues in delay analysis; 1.4 Presentation and case study; Chapter 2: Construction Programmes; 2.1 Introduction; 2.2 Planning and programming; 2.3 CPM programming techniques -- the fundamentals; 2.4 Baseline validation; 2.5 Other planning techniques; 2.6 Why use CPM planning or scheduling techniques?; 2.7 Project controls and the project control cycle; 2.8 Records, records, records . . .; 2.9 Predatory programming practices; 2.10 Guidance; Chapter 3: Identification of Construction Delays.

3.1 Establishing a basis for identifying delay3.2 Factual evidence and as-built programmes; 3.3 Identification of delay events; 3.4 Identification and analysis of disruption; Chapter 4: Analysis of Construction Delays; 4.1 Introduction to delay analysis techniques; 4.2 Explanation of the available techniques; 4.3 Selection criteria and guidance; 4.4 Summary; Chapter 5: Problematic Issues; 5.1 Introduction; 5.2 Float and delay claims; 5.3.

Read More ↓

Subjects

Writers

Rate & Review

0.0/5
(0 people Voted)

No reviews yet. Be the first to rate this work.

Files & Downloads

  • Delay analysis in construction contracts -- (.pdf)

    PDF · 3.8 MB · updated