Title Statements
- Full title :Delay Analysis in Construction Contracts.
Summary
The most significant unanticipated costs on many construction projects are the financial impacts associated with delay and disruption to the works. Assessing these, and establishing a causal link from each delay event to its effect, contractual liability and the damages experienced as a direct result of each event, can be difficult and complex. This book is a practical guide to the process of delay analysis and includes an in-depth review of the primary methods of delay analysis, together with the assumptions that underlie the precise calculations required in any quantitative delay analysis. T.
Read More ↓Edition Statements
- Publication Date:2015.
- Edition:2nd ed
Publication Statements
- Publisher(s):Wiley
- Place of Publication:Hoboken
- Language:eng
- Publication Date:2015.
Notes
5.1.5 As-built based methods of analysis.
The Physical Object
- Description:1 online resource (291 pages)
Edition Identifiers
- ISBN:9781118631126, 1118631129, 9781118631133, 1118631137, 9781118631171, 111863117X
- oclc:ocn908519952
- LC Classification:HD9715.A2
- Dewey Decimal:690.068/5
Table of Contents
Cover; Title Page; Copyright; Contents; About the Authors; Preface to the Second Edition; Preface to the First Edition; Chapter 1 Introduction; 1.1 General; 1.1.1 Purpose of this book; 1.1.2 Guidance; 1.1.3 Construction planning and programming; 1.2 Construction delays; 1.2.1 Identifying delays; 1.2.2 Analysing construction delays; 1.2.3 Delay claim life cycle; 1.3 Burning issues in delay analysis; 1.4 Presentation and case study; Chapter 2 Construction Programmes; 2.1 Introduction; 2.1.1 Planning, programming and project controls; 2.1.2 Elements of a successful project.
2.2 Planning and programming2.2.1 Project planning; 2.2.2 Work breakdown structure; 2.3 CPM programming techniques: the fundamentals; 2.3.1 Activity durations; 2.3.2 Activity relationships; 2.3.3 Event date calculations; 2.3.4 Forward pass; 2.3.5 Backward pass; 2.3.6 Total float; 2.3.7 Constraints; 2.4 Baseline validation; 2.4.1 Joint baseline review; 2.4.2 Programme approval; 2.4.3 The project baseline; 2.5 Other planning techniques; 2.5.1 PERT -- Project Evaluation and Review Technique; 2.5.2 Gantt charts (bar charts); 2.5.3 Line of balance; 2.5.4 Critical chain method/theory of constraints.
2.6 Why use CPM pl…
Subjects
Writers
No reviews yet. Be the first to rate this work.
Files & Downloads
-
Delay Analysis in Construction Contracts -- (.pdf)
PDF · 3.0 MB · updated
Rate & Review