Annotation, "This manual covers the horizontal auger boring method, providing the instructions for a safe, productive, and efficient installation of pipelines for road crossing. The manual is divided into five sections; the first section is an introduction that includes history,…
"This manual covers the horizontal auger boring method, providing the instructions for a safe, productive, and efficient installation of pipelines for road crossing. The manual is divided into five sections; the first section is an introduction that includes history, recent inno…
"Pipe Ramming Projects presents the latest and best practices used by engineers and construction professionals for the design and construction of road and railroad crossings using pipe ramming technologies. Providing both introductory and advanced design and construction informa…
Prepared by the Pipe Ramming Task Force of the Trenchless Installation of Pipelines Committee of the Pipeline Division of ASCE. Pipe Ramming Projects presents the latest and best practices used by engineers and construction professionals for the design and construction of road a…
"This manual describes technologies used by engineers and transportation professionals in renewing culverts and drainage structures under roads, railroads, airport runways, streets, and similar structures. Trenchless Renewal of Culverts and Storm Sewers covers topics such as saf…